


A copy of this inspection approval must be submitted with the permit transfer application to Ameren Missouri.Ĭonstruction of residential docks and breakwaters or approved modifications to docks or breakwaters must be completed within one year from the date the permit or modification approval is issued. 8' 12' floating boat dock blue plastic 55 gallon drums, floating dock cube 20x20x16' It’s constructed by placing decking over airtight barrels, drums, or marine floats (Pleasantville) 12x12 floating dock with diving board With floating docks, you don’t have to worry about that, because whatever the water level it is, it will. Some large residential and commercial docks may have a permit term of up to 4 years. If the work is not complete within the permit term, the permittee may apply for one, 6-month extension to complete the work. The extension will be granted provided there have not been any changes in the information that was submitted with the original application, and the dock complies with current guidelines for issuing permits. The dock frame must support both sides and ends of float drum. Most other activities (bank stabilization, piers, excavation, etc.) must be completed within two years from the date the permit is issued. Minimum frame support of float drum must be every 24 x 48 or every eight square feet. All mounting slots of float drum must be bolted or lagged to the frame if dock is exposed to strong wave action. Float drums that are four feet long (or less) must be attached to the frame by using at least four mounting slots.
